Lunar Base Infrastructure Schematic — Engineering_
FileEditViewGoFavoritesHelp
UpAddress:C:\Projects\hardware\nasa-has-lunar-base
Drawing BAS-004 · Entry 04 · Oct 2023 – Mar 2024

Lunar Base Infrastructure Schematic

Space Systems · NASA High School Aerospace Scholars
Complete

A 20-week NASA program in aircraft design, space systems, and lunar mission planning that culminated in a lunar base schematic engineered within strict power and mass budgets and presented to NASA engineers.

Program

  • Completed a 20-week NASA High School Aerospace Scholars program spanning aircraft design, space systems, and lunar mission planning.

Design & constraints

  • Used CAD to design lunar base infrastructure while analyzing operational constraints.
  • Co-engineered the base schematic within strict power and mass budgets — the constraints drove every design choice.

Review

  • Presented the final CAD model to NASA engineers for technical review.

Specifications

Program:NASA HAS (20 weeks)
Constraints:Power & mass budgets
Tools:CAD
Deliverable:Lunar base schematic
Reviewed by:NASA engineers
Tools:CADSystems EngineeringConstraint Analysis
Complete · Student Researcher, scale ConceptSpace Systems